A. Introduction - NERC
Standard IRO-010-2 Reliability Coordinator Data Specification and Collection A. Introduction 1. Title: Reliability Coordinator Data Specification and Collection 2. Number: IRO-010-2 3. Purpose: To prevent instability, uncontrolled separation, or Cascading outages that adversely impact reliability, by ensuring the Reliability Coordinator has the data it needs to monitor and assess the operation of its Reliability Coordinator Area. 4. Applicability Reliability Coordinator. Balancing Authority. Generator Owner. Generator Operator. Load-Serving Entity. Transmission Operator. Transmission Owner.
R2. The Reliability Coordinator shall distribute its data specification to entities that have data required by the Reliability Coordinator’s Operational Planning Analyses, Real-
Download A. Introduction - NERC
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
INTERNATIONAL STANDARD ON RELATED, International standard on related services, To perform, Latest Advances and Future Prospects of Welding, Diaphragmatic Breathing, Perform Qualitative Risk Analysis, Position: Chief Accountant Responsibilities, The Contents of PROC CONTENTS, The Contents of PROC CONTENTS to Perform