APPENDIX C - UNIT PIPE PRICES C.1 Introduction …
C-1APPENDIX C - unit pipe Introduction and SummaryThis APPENDIX summarizes unit pipe PRICES and their derivation. The cost of constructingpipelines is the largest single cost in the project, accounting for $65 million of the total project cost aspresented in Table 7-1 (Volume I). Project costs are sensitive to the unit PRICES of pipe . Tables C-1aand C-1b summarize the selected unit pipe PRICES in October 1998 values. Table C-2 comparesselected unit pipe PRICES with Bureau of Reclamation estimates for this project. Comparison with bidprices received by the State in the project region in August 2000 is also presented. The methodology of arriving at unit pipe PRICES involved examination of bidding on projects inSouth Dakota, namely the Mni Wiconi and Mid-Dakota Projects.
C-1 APPENDIX C - UNIT PIPE PRICES C.1 Introduction and Summary This appendix summarizes unit pipe prices and their derivation. The cost of constructing
Download APPENDIX C - UNIT PIPE PRICES C.1 Introduction …
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
Unit, UNIT 22: PROGRAMMABLE LOGIC CONTROLLERS, 1 UNIT 22: PROGRAMMABLE LOGIC CONTROLLERS Unit code, FOREIGN EXCHANGE QUOTATIONS Foreign, FOREIGN EXCHANGE QUOTATIONS Foreign exchange, Trigonometry Review with the Unit, Unit 1. Electronic Principles, Unit 1. Electronic Principles 1, Cabinet unit heater submittal data, Health & Social Care, 19mm) Insulating Glass Unit Performance Using 1