Appendix E Environmental Management Plan - …
DRAFT Environmental Management plan (EMP). For the PROPOSED CONSTRUCTION OF AN ESKOM GENERAL LANDFILL. AND A HAZARDOUS WASTE STORAGE FACILITY IN LEPHALALE, LIMPOPO PROVINCE. May 2009. DEAT Reference Number: 12/12/20/1399. PREPARED FOR: Eskom Holdings (Pty) Ltd Eskom Generation Division P O Box 1091. Johannesburg 2000. Tel: (011) 800-2706. Fax: (011) 800 -3791. COMPILED BY: Envirolution Consulting (Pty) Ltd PO Box 1898. Sunninghill 2157. Tel: (0861) 44 99. Fax: (0861) 62 62 22. E-mail: Website: Copyright Warning - With very few exceptions the copyright of all text and presented information is the exclusive property of Envirolution Consulting. It is a criminal offence to reproduce and/or use, without written consent, any information, technical procedure and/or technique contained in this document. Criminal and civil proceedings will be taken as a matter of strict routine against any person and/or institution infringing the copyright of Envirolution Consulting (Pty) Ltd Reg. No.
Environmental Management Plan 4 Eskom Landfill EIA May 2009 Compiled by Envirolution Consulting In general, the purpose of this EMP is to formulate mitigatory measures that should be
Download Appendix E Environmental Management Plan - …
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
17 Construction environmental management plan, Environmental, Hygiene Management Guide, WASTE MANAGEMENT PLAN, Connecticut, National Hazardous Waste Management Plan, Environmental and social management Guidelines, New York City Department of Environmental, New York City Department of Environmental Protection Long, Plan, ENVIRONMENTAL MANAGEMENT AND CO, Environmental Management and Co-ordination