PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: marketing

Basic Fire Door Requirements

Back to document page

TECHNICAL DATA SERIESS D ISTEEL DOOR INSTITUTE30200 DETROIT ROAD - CLEVELAND, OHIO 44145118 - 01Basic Fire DoorRequirements 2001 Steel Door Institute2Technical Data SeriesSDI 118-2001Basic Fire Door RequirementsOpeningWallRatingDoor andFrame RatingDescription and Use4 Hour3 Hour(180 minutes)These openings are in walls that separate buildings or dividea single building into designated fire Hour1-1/2 Hour(90 minute)Openings of this type are used in enclosures of verticalcommunication or egress through buildings. Examples ofthese types of openings include stairwells and elevator Hour1 Hour(60 minute)These door and frame assemblies divide occupancies in Hour3/4 Hour(45 minute)For use where there are openings in corridors or room Hour1-1/2 Hour(90 minute)This opening is in a wall where there is the potential for severefire exposure from the exterior of the Hour3/4 Hour(45 minute)This opening is in an exterior wall that has the potential to beexposed to moderate to light fire from the exterior of Hour1/3 Hour(20 minute)These openings are in corridors where smoke and draft controlis required.

These door and frame assemblies divide occupancies in a building. 1 Hour 3/4 Hour (45 minute) For use where there are openings in corridors or room parti-tions. 2 Hour 1-1/2 Hour (90 minute) This opening is in a wall where there is the potential for severe fire exposure from the exterior of the building. 1 Hour 3/4 Hour (45 minute)

  Building, Occupancies

Download Basic Fire Door Requirements


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Related search queries