Basic Rigging BNL Workbook 2008-10-13
Basic Rigging Workbook Training and Qualifications Program Office October 13, 2008. -2- Table of Contents Determine Task and Job-Site 4. Characterize the Load ........................................ ........................................ ..................... 7. Specify, Select, and Inspect Rigging 15. Wire Rope Slings ........................................ ........................................ ..................... 15. Synthetic Slings.
- 6 - If the lift has been classified as a pre-engineered lift, then additional criteria must be met prior to operation. If determined to be a critical lift, Plant Engineering riggers or an