Basic Rigging Workbook - BNL
Basic Rigging Workbook Training and Qualifications Program Office October 13, 2008 - 2 - - 3 - Table of Contents Determine Task and Job-Site 4 Characterize the Load ........................................ ........................................ ..................... 7 Specify, Select, and Inspect Rigging 15 Wire Rope 15 Synthetic 19 21 Shackles ........................................ ........................................ .................................. 22 Eye 24 Hoist Rings ........................................ ........................................ .............................. 26 Turnbuckles.
of tooling, fixtures, sketches, analyses, and written procedures, the possibility of dropping, upset, or collision is reduced to an acceptable level, the lift may be designated as a pre-engineered lift. A Pre-Engineered Lift Plan must be completed and submitted to the Lifting Safety Committee chair prior to any work being performed.
Download Basic Rigging Workbook - BNL
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: