Chapter 13 Control Survey Procedures
highway Surveying Manual Page 13-1 January 2005Chapter 13 Control Survey Procedures13-01 GeneralControl surveys establish a common, consistent network of physical points that are the basis for controlling the horizontal and vertical positions of transportation improvement projects and facilities. Corridor Control surveys ensure that adjacent projects have compatible Control . Project Control surveys provide consistent and accurate horizontal and vertical Control for all subsequent project surveys photogrammetric, mapping, planning, design, construction, and right of following policies, standards, and Procedures are applicable to all Control surveys for WSDOT involved transportation improvement projects.
Highway Surveying Manual Page 13-1 January 2005 Chapter 13 Control Survey Procedures 13-01 General Control surveys establish a common, consistent network of physical points that are the
Download Chapter 13 Control Survey Procedures
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
National Cooperative Highway Research Program, Highway, Research, TRANSPORTATION RESEARCH BOARD EXECUTIVE, RUDERMAN WHITE PAPER SELF-DRIVING, IMPACT ON PEOPLE WITH DISABILITIES, UTCA, ADDRESS SERVICE REQUESTED Washington, Default Values for Highway, Default Values for Highway Capacity and, NATIONAL COOPERATIVE HIGHWAY RESEARCH, PROGRAM, National, COOPERATIVE RESEARCH PROGRAM