CONSTRUCTION GUIDE
CONSTRUCTION guideFor the installation of conduit, manholes and splice boxesOne call to Miss Utility can savetime, money and you pick up any equipment, pick up the phone and call Miss Utility. Miss Utility will notify all applicable utility companies and see to it that your job site is marked for all underground utility lines. One simple phone call can save you the time and hassle of dealing with job site mistakes and delays. Not to mention decrease liability, prevent damage, reduce injuries and possibly save lives. After all, safety is everyone s Miss Utility, at least 48 hours prior to work, at 811 or Safely CHECKLIST1. Call Miss Utility at 811 or at least 48 hours prior to Allow the required time for utilities to mark the underground Respect and protect all Excavate with care.
configuration of ducts. 4. All direct-buried ducts shall be UL schedule 40. 5. All bends shall be no less than 36” in radius. A total of two (2) 90-degree bends are allowed in the conduit line (i.e., conduit turn up at transformer pad is one (1) 90-degree bend). One (1) additional, wide-radius bend (minimum
Download CONSTRUCTION GUIDE
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: