DESIGN AND SPECIFICATION GUIDELINES
DESIGN AND SPECIFICATION GUIDELINESFOR LOW pressure sewer SYSTEMSPREPARED BYA TECHNICAL ADVISORY COMMITTEE FORTHE STATE OF FLORIDA DEPARTMENTOF ENVIRONMENTAL REGULATIONJune1981DESIGN AND SPECIFICATION GUIDELINESFOR LOW pressure sewer SYSTEMSPrepared by aTechnical Advisory CommitteeDan Glasgow, Editor and ChairmanWilliam C. BowneThomas H. BraunEdward T. KnudsenJames F. Kreissl*Paul A. Kuhn*Robert E. LangfordPatricia H. LodgeDavid A. MaurerJames E. SantaroneHarold E. SchmidtB. Jay SchrockDr. G. J. ThabarajRichard D. Vaughan*John G. HendricksonStaff assistance was provided by the General Development Corporation,Miami, Florida* Principal Contributing AuthorsFOREWORDIn April 1980, Mr. Jake Varn, Secretary of the State of Florida Department of EnvironmentalRegulation authorized the formation of a Technical Advisory Committee to prepareDepartmental DESIGN and Specifications GUIDELINES for Low pressure sewer Systems.
phasing, construction, and terminal treatment system location and design. Local regulations and institutions represent major determinants of pressure sewer designs. Table 1-4 indicates the preliminary regulatory constraints which should be determined prior to design. Institutional arrangements in the service locality must be determined to ascertain
Download DESIGN AND SPECIFICATION GUIDELINES
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
The specification, design and construction of drainage, The specification, design and construction of drainage and sewerage, The specification, design and construction of, SPECIFICATIONS FOR PIPELINE OCCUPANCY OF NORFOLK, Specification, Design and Construction, Construction, Design, The ’Specification, Drainage, Drainage design, Of drainage