PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: marketing

DIVISION 1 GENERAL DATA - …

Back to document page

DIVISION 1GENERAL DATA 01010-1 SECTION 01010 SUMMARY OF WORK PART 1 GENERAL SECTION INCLUDES A. Description of Existing Facilities B. GENERAL Scope of Work C. Contractor s Responsibilities D. System Operations E. Work Sequence F. Owner Occupancy G. Contract Documents DESCRIPTION OF EXISTING FACILITIES The existing Rosedale Wastewater Treatment facility consists of a 122,000 gpd (average) extended aeration package plant, chlorination (chlorine gas), dechlorination (sulfur dioxide), parshall flume metering structure and post aeration. The existing site also includes sludge drying beds, sludge holding tank, sludge transfer station, lab building and chemical building. GENERAL SCOPE OF WORK A. The work is as described herein, as shown on the plans, and as specified in the bid/specifications documents.

01010-1 SECTION 01010 SUMMARY OF WORK PART 1 GENERAL 1.1 SECTION INCLUDES A. Description of Existing Facilities B. General Scope of Work

  General, General 1

Download DIVISION 1 GENERAL DATA - …


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Related search queries