Expanded Work Breakdown Structure Weight Classification ...
INTERNATIONAL SOCIETY OF ALLIED WEIGHTS ENGINEERS, INC. RECOMMENDED PRACTICE NUMBER XX Serving the Aerospace - Shipbuilding - Land Vehicle and Allied Industries Executive Director Box 60024, Terminal Annex Los Angeles, CA 90060 Date Issued 4 March 2011 Expanded work Breakdown Structure Weight Classification Guidance Revision Letter 2 Prepared by Government - Industry Workshop Society of Allied Weight Engineers, Inc. All SAWE technical reports, including standards applied and practices recommended, are advisory only. Their use by anyone engaged in industry or trade is entirely voluntary.
4 1 Scope This recommended practice provides clarification and guidance for implementing the Expanded Ship Work Breakdown Structure (ESWBS) weight classification system. This guidance provides a common weight system that transcends all ship classes. The recommended practice will provide a static classification system based on the original
Download Expanded Work Breakdown Structure Weight Classification ...
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: