FOR CONSTRUCTION 2011

Back to document page

STANDARD DRAWINGS FOR CONSTRUCTION 2011 CITY OF RIVERSIDE DEPARTMENT OF PUBLIC WORKS May 2011 CONTENTS PART 1 - GENERAL PROVISIONS 1-4 SECTION 1 - TERMS, DEFINITIONS, ABBREVIATIONS AND SYMBOLS 1 SECTION 2 - SCOPE AND control OF THE WORK 3 SECTION 6 - PROSECUTION, PROGRESS AND ACCEPTANCE OF THE WORK 3 SECTION 7 - RESPONSIBILITIES OF THE CONTRACTOR 4 PART 2 - CONSTRUCTION MATERIALS 6 PART 3 - CONSTRUCTION METHODS 7 best management practices FOR TYPICAL CONSTRUCTION ACTIVITIES 15 STANDARD DRAWINGS Attached Supplemental Notes to Std.

7-8.6 Water Pollution Control. 7-8.6.1.1 General Requirements. For projects under one acre, the Contractor must follow and implement the Best Management Practices (BMPs) required by the attachment to these Supplemental Notes titled “Best Management Practices for Typical Construction Activities”.

  Practices, Management, Control, Best, Best management practices, Mbps

Download FOR CONSTRUCTION 2011


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Related search queries