Gluedown Installation Guidelines
English Gluedown Installation Guidelines ........................................ ........................................ ........................ 2Deutsch Hinweise zur Verlegung von Gluedown ........................................ ........................................ ............ 6Francais Instructions d Installation du rev tement de sol coller ........................................ ..................... 11Espa ol-Americas Instrucciones para Instalaci n con Pegamento ........................................ ...................................... 16Espa olInstrucciones de instalaci n de suelos adhesivos ........................................ ................................... 21Nederlands Gluedown installatiehandleiding.
The underfloor heating must be commissioned before installation commences. It should then be switched off 48 hours before, during, and 48 hours after installation. Then the temperature can be gradually increased to 85°F* (27°C) at no more than 4°F (2°C) per day to the desired temperature. Electrical underfloor heating: please consult
Download Gluedown Installation Guidelines
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: