High risk construction work Safe Work method statement ...
1/4HIGH RISK construction work SAFE work method statement TEMPLATENoteWork must be performed in accordance with this SWMS must be kept and be available for inspection until the high risk construction work to which this SWMS relates is the SWMS is revised, all versions should be a notifiable incident occurs in relation to the high risk construction work in this SWMS, the SWMS must be kept for at least two years from the date of the notifiable conducting a business or undertaking (PCBU) nameContact detailsPrincipal contractor (PC) nameContact details Works managerContact phoneDate SWMS provided to PC (DD/MM/YYY) work activity (Job description)Workplace locationHigh risk construction work : Risk of a person falling more than two metres (Note: in some jurisdictions this is three metres)Likely to involve disturbing asbestosWork in or near a shaft or trench deeper than m or a tunnelWork on or near chemical, fuel or refrigerant linesTilt-up or pre-cast concrete elementsWork in areas with artificial extremes of temperatureWork on a telecommunication towerTemporary load-bearing support for structural alterations or repairsUse of explosivesWork on or near energised electrical installations or servicesWork on, in or adjacent to a road, railway, shipping lane or
Work on or near energised electrical installations or services Work on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians. Work in or near water or other liquid that involves a risk of drowning Demolition of load-bearing structure. Work in or near a confined space
Download High risk construction work Safe Work method statement ...
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
Control, Form, Work Zone Traffic Control, Zone, Zone inspection, Traffic, Work, Safe Work Method Statement – Work in, Safe Work Method Statement – Work in or near excavation deeper than, SECTION 102 MAINTENANCE OF TRAFFIC, Work zone, Traffic control, Inspection, Entry control facilities access control points, Activity Hazard Analysis, Inspection Form