1/4HIGH RISK construction WORK SAFE WORK method statement TEMPLATENoteWork must be performed in accordance with this SWMS must be kept and be available for inspection until the high risk construction work to which this SWMS relates is the SWMS is revised, all versions should be a notifiable incident occurs in relation to the high risk construction work in this SWMS, the SWMS must be kept for at least two years from the date of the notifiable conducting a business or undertaking (PCBU) nameContact detailsPrincipal contractor (PC) nameContact details Works managerContact phoneDate SWMS provided to PC (DD/MM/YYY)Work activity (Job description)Workplace locationHigh risk construction work: Risk of a person falling more than two metres (Note: in some jurisdictions this is three metres)Likely to involve disturbing asbestosWork in or near a shaft or trench deeper than m or a tunnelWork on or near chemical, fuel or refrigerant linesTilt-up or pre-cast concrete elementsWork in areas with artificial extremes of temperatureWork on a telecommunication to

construction and installed in accordance with the specific design. • Timber joist will be installed on top of bearers from below and be spaced at 400 mm centres. • Ply sheets will be laid progressively in front of the worker, and a minimum of 1800 mm will be maintained if no edge protection is in place.

  Construction, Timber

Download High risk construction work Safe Work method statement ...


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Related search queries