I 2017
INB-263, RCI-12017NB-263, RCI-1, RULES FOR COMMISSIONED INSPECTORS (RCI-1)In 2016, the National Board approved the 2017 Edition of NB-263, RCI-1, Rules for Commissioned Inspectors. The effective date of the standard will be July 1, 2017 . The new changes may be implemented any time prior to July 1, 2017 , but will become effective on that new edition of RCI-1 is planned for every two years, with the next edition effective July 1, Committee on Qualifications for Inspection is responsible for maintaining and revising RCI-1. This Committee meets regularly to consider revisions to existing requirements and to formulate new requirements.
II I T CONTENTS 2017 TABLE OF CONTENTS Rules for Commissioned Inspectors Personnel.....
Download I 2017
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
ASME Boiler and Pressure Vessel Code 2017, 2017, ASME Boiler and Pressure Vessel Code, ASME, Boiler, Code, CFR 192 Transportation of Natural and Other, Transportation of Natural and Other, Pressure, TECHNICAL TIN, ASME Code, Pressure Vessel Inspections, Boiler and Pressure Vessel, ASME BOILER AND PRESSURE VESSEL