PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: dental hygienist

Installation and Flowmeter Orientation

Back to document page

181Rosemount DP FlowSeptember and Flowmeter OrientationAnnubar Installation considerations Table 1. Annubar Straight Run Requirements(1)Upstream (inlet) sideAnnubar products3051SFC_A, 3051CFC_A, 2051CFC_A, 3051SFA, 3051CFA, 2051CFA, 485, 405A, 585 (2)Without straightening vanes (3)With straightening vanes(4)In planeOut planeFrom disturbanceFrom straightening vaneReducer121284Expander181884Single Elbow (90 ) or tee81084Two E lb ow s in p la n e111684Two Elbow out of plane232884Butterfly Valve (75-100% open)303084Ball / Gate Valve full open81084Downstream (outlet) side4444(1)Consult an Emerson Process Management representative if a disturbance is not listed or if multiple disturbances are present.(2)Consult the factory for instructions regarding use in square or rectangular ducts.(3)In Plane means the Annubar is in the same plane as the elbow. Out of Plane means the bar is perpendicular to the plane of the upstream elbow. Refer to Figure 1 on page 181.

183 September 2014 Rosemount DP Flow www.rosemount.com Orifice plate pipe orientation Pipe orientation for both 3051SFC, 3051CFC,2051CFC, 405C, 405P, 3051SFP, 3051CFP, 2051CFP AND 1195.

  Installation, Rosemount, Orientation, Flowmeter, Orifice, Installation and flowmeter orientation, 3051sfc

Download Installation and Flowmeter Orientation


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Related search queries