INSTALLATION AND MAINTENANCE …
5100 North IH 35 Round Rock, Texas 78681Phone: 800-451-8798 512-255-4141 Fax: 512-244-5512INSTALLATION ANDMAINTENANCE INSTRUCTIONSFOR THREE PHASEINDUCTION MOTORSFrames 56 and 143T - 449TZRECEIVING1. Check nameplate Check whether any damage has occurred during After removal of shaft clamp, turn shaft by hand to check that it turns If motor is to be reshipped (alone or installed to another piece of equipment) the shaft must againbe clamped to prevent axial : Remove the bearing clamp before turning the shaft on 284T-449TZ frame FOLLOWING SAFETY PRECAUTIONS MUST BE OBSERVED:1. Electric rotating machinery and high voltage can cause serious or fatal injury if improperlyinstalled, operated or maintained.
MOUNTING 1. Mount motor securely on a firm, flat base. All ball bearing normal thrust motors up to and including 256T frame size may be side-wall or ceiling mounted; all others check nearest
Download INSTALLATION AND MAINTENANCE …
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: