Example: tourism industry
Installation Guide - Sub-Zero
3-wire or 4-wire installation. Remove the terminal block cover to expose the screws with corresponding numbers. Route the wires through the strain relief and to the termi-nal block. THREE-WIRE INSTALLATION 1 Move the metal ground strap to positions one and two. Refer to the illustration below. 2 Connect green/ground to position one.
Download Installation Guide - Sub-Zero
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: