lblin. - Engineering Dynamics
Motor- Generator vibration ProblemsEncountered'When Restaging an FCCU TurboexpanderbyFred R. SzenasiEngineering Dyna,mics IncorporatedThis paper describes the solution of a vibration problem which resulted from the conver-sion of a single-stage power-recovery turbo expander train in an FCCU to a two-stage turboexpander. Details of the equipment train and operating speeds are given in Figure 1. Duringthe start up of the upgraded expander train, high vibrations (in excess of 10 mils peak-peak)were experienced by the motor-generator.
Motor- Generator Vibration Problems Encountered'When Restaging an FCCU Turboexpander by Fred R. Szenasi Engineering Dyna,mics Incorporated This paper describes the solution of a vibration problem which resulted from the conver-
Download lblin. - Engineering Dynamics
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
Vibration, Electronic Vibration Analyzer, Vibration analysis, CSI 2130Mach inery Health Analyzer, Machinery Vibration, Balance, Vibration, and Vibration Analysis, Balance, Fundamentals of Vibration Measurement and, Fundamentals of Vibration Measurement and Analysis, Using Vibration Analysis To Identify & Help, Monitoring Reciprocating Compressors