Managing Pilot Projects - wciltd.com
ManagingPilotProjectsSome Guidelines Derivedfrom ExperiencePilot and prototype design are different from conventional Projects . Yetproject management courses and texts seldom deal directily with the issuesinvolved in Managing them. This brief document gives some insights whichhave been gained with such Projects in a variety of engineering andinformation systems environment. WCI (Workplace Competence International Limited)Hillsburgh, Ontario, Canada RIGHTS RESERVED 1991, 2002Managing Pilot ProjectsPage 2 of 7General or prototype design Projects need to managed in ways which are very different fromconventional Projects .
Managing Pilot Projects Page 3 of 7 The Prototype Design Project Success Factors: Calendar Defined Timing 1. Define the step in the project on the basis of the calendar, since the work break down structure cannot be based on history. 2. Set each work stage to last a maximum of a quarter (3 months).
Download Managing Pilot Projects - wciltd.com
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: