METERING INSTALLATION REQUIREMENTS
ELECTRIC SERVICE REQUIREMENTS REVISION PAGE 07/17//2012 METERING A METERING INSTALLATION REQUIREMENTS Table of Contents Section 300 PARAGRAPH PAGE METERING AND SERVICE ENTRANCE equipment ........................................ .......................... 1 GENERAL ........................................ ........................................ ........................................ .. 1 METERED AND UNMETERED CONDUCTORS ........................................ ............................. 1 SEALING OF METERS AND METERING 1 UNACCEPTABLE equipment IN SEALED AREAS.
authorities or not, provision shall be made for the installation of metering equipment. It shall comply with these service requirements except when existing metering equipment, in the opinion of CRA-ES, is satisfactory and adequate to register all current to be supplied.
Download METERING INSTALLATION REQUIREMENTS
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: