Sample OnlyMETHOD STATEMENT FOR DRILLING & SAMPLING WITH ARCHWAYCOMPETITOR RIGGeneralThe Competitor is designed to sink boreholes up to 130 mm diameter through soils and weakrock, including clays, silts, sands, gravels and chalk. The rig is primarily used for shallow siteinvestigations to a maximum depth of 10 metres, and for carrying out in-situ tests (SPT andDP) to a maximum depth of 15 metres. In practice, the actual depth achieved is dependent onlocal ground rig consists essentially of a mechanized drop-weight that repeatedly falls onto an anvil,driving attached sample tubes or probe rods into the ground. The METHOD can therefore beclassified as a form of drive sampling in which a tube or split tube sampler having a sharpcutting edge at its lower end is forced into the ground by dynamic impact (BS 5930: 1981).After driving samplers to the required depth, they can be simply extracted using an integralhydraulic ram on the rig. No separate jacking system is samples obtained by this METHOD can be classified as either disturbed, or undisturbed,depending on the type of sampling apparatus used in conjunction with the rig (see below forcharacteristics of compatible sampling apparatus).
Sample Only METHOD STATEMENT FOR DRILLING & SAMPLING WITH ARCHWAY COMPETITOR RIG General The Competitor is designed to sink boreholes up to 130 mm diameter through soils and weak
Download METHOD STATEMENT FOR DRILLING - Archway …
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
Value Assessment Method for Evaluating, METHOD STATEMENT INSTALLATION OF, Installation, Method Statement, NEMA Guidelines for the, INSTALLATION AND TESTING PRACTICES, STATEMENT, METHOD STATEMENT FOR THE INSTALLATION, Balla to Claremorris Issue Date Method, Instructions for the Use of the Excel Spreadsheet