Microsoft Project Dissected - Construction CPM
Microsoft ProjectDissectedby Ron Winter, PSPSchedule Analyzer SoftwareCopyright 2012Third AnnualConstruction CPM ConferenceIntroduction Although Oracle/Primavera P6 is dominant Many contracts specify/allow MSPAdvantages of MSP Costs less user -friendly Easy to start scheduling immediately Decent default graphics and reports On most US Federal Government PCs Introduction Updating Task Status Introduction to Ease-of-use Features How to update correctly The CPM according to Microsoft MSP and the Data Date MSP and the Data Date Correctly calculating the CPM Analyze ProgressUpdating File based system Work performed in memory manual save Prevents simultaneous
• User-friendly – Easy to start scheduling immediately ... − Manual save • Prevents simultaneous updates − One person at a time • Best suited for localized, small group ... • MS can be used to simulate P6 CPM logic – Correct CPM settings to use • Schedule Options Tab
Download Microsoft Project Dissected - Construction CPM
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Related search queries
PROJECT PLANNING & SCHEDULING USING PRIMAVERA P6, Project Planning & Scheduling Using Primavera, Manual, User, CPM P6 User Manual, Critical Path Method, P6 File Corruption, P6 Analytics Reference Manual Release 3, Oracle, Practices for CPM Schedule Specification Compliance, Primavera P6 ® NYSDOT CPM Scheduling Guide