RISK RATING SAFE WORK METHOD STATEMENT …
Weed & grass trimmer Operation by Ray Leak 11/17/2008RISK RATING1 HIGH2 MEDIUM3LOWSAFE WORK METHODSTATEMENTTitle:: Weed & GrassTrimmerRef No: 1I approve the use of this Safe Work METHOD STATEMENT :NAME: POSITION:DepartmentManagerSIGNATURE: DATE:____/____/____Work Site/Project/Depot:Critical Steps in this Activity:Potential Hazards:Safety Controls: Pre inspection of weed/ grass trimmer MEDIUM Missing or loose parts Lack of maintenance Before running trimmer . Check for missing, wore, and loose parts. Ensure guards are attached. Inspect fuel lines and fuel tank Adjust handle and strap for comfort and balance If unit is unsafe to operate place a tag on the handle and take toworkshop red area for repair.
Weed & Grass Trimmer Operation by Ray Leak 11/17/2008 Safe Work Method Statement The personnel listed below have been made aware or and understand the procedure, hazards and control measures outlined in the
Download RISK RATING SAFE WORK METHOD STATEMENT …
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: