SAFE WORK METHOD STATEMENT – Part 1 …
safe work METHOD STATEMENT part 1 EARTHWORKS. Personal Protective Equipment Foot Hearing High Head Eye Face Hand Protective Breathing Protection Protection Visibility Protection Protection Protection Protection Clothing Protection Day Operations Normal Requirements: Safety footwear, hearing protection, high visibility shirt or vest, hard hat and sun protection if required eye/face protection (goggles) face protection (welding mask), hand protection (gloves), snug-fitting clothes (machine operators) breathing protection as required for tasks. Ensure all PPE meets relevant Australian Standards.
Doc # GRF HSE 008.02 REVISION 2 Date 3 March 2014 Page 1 of 12 SAFE WORK METHOD STATEMENT – Part 1 EARTHWORKS Personal Protective Equipment