Example: air traffic controller
Scheduling: The Multi-Level Feedback Queue
6 SCHEDULING: THE MULTI-LEVEL FEEDBACK QUEUE Q2 Q1 Q0 0 50 100 150 200 Q2 Q1 Q0 0 50 100 150 200 Figure 8.5: Without (Left) and With (Right) Priority Boost First, there is the problem of starvation: if there are “too many” in- teractive jobs in the system, they will combine to consume all CPU time,
Download Scheduling: The Multi-Level Feedback Queue
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document: