Sequence of Operation

Back to document page

Design Guidelines and Standards Manual9/16/96University of CincinnatiSEQUENCE OF OPERATION15985 - 1SECTION 15985 - Sequence OF Sequence of Operation to be submitted with shop drawing submittal of Section 2 - HVAC with controls shall be installed and programmed to perform as described in this section,and as applicable to the specific 3 - OF , (S/S) AHU1. With the H-O-A switch on the starter panel, in the H position, the system shall be energizedand the system safety devices shall protect the With the H-O-A switch on the starter panel in the "H" position, the unit will With the H-O-A switch in the "A" position, the unit will operate in response to DDC controland system safety Programsa.

4. Terminal box reheat to full heat. 5. VAV terminal box damper to full open. 6. When return air temperature increases above the setpoint, the warm-up cycle shall terminate. 7. Programs a. Schedule b. DDC - Setpoint control c. Occupied mode 8. Control Points AI AO BI BO a. Return air temp. X b. Outside air damper X c. Terminal box damper X d ...

  Terminal, Heaters

Download Sequence of Operation


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Related search queries