Tools, Installation, Operation, Maintenance
Tools, installation , Operation and Maintenance Safe, efficient operation of any product is inherently dependent upon its proper installation . In this section the preparation and assembly of low, medium and high pres- sure connections is explained. Also covered is the assembly procedure for medium and high pressure anti-vibration collet gland assemblies. Correct installation procedures are further promoted by providing dimensional information associated with a variety of Parker Autoclave Engineers tube connections as well as the torque required to properly seat numerous Parker Autoclave Engineers components.
3 Tools, Installation, Operation, and Maintenance 02-0140SE 1221 Installation: SpeedBite Connection Complete Connection The illustration below (Fig. 1) shows the condition of sleeve and tubing after completion of “sleeve seating.”