PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: marketing

SPECIFICATIONS FOR FIRE HYDRANT & SPRINKLET SYSTEM. - …

Back to document page

1 SPECIFICATIONS FOR FIRE HYDRANT & SPRINKLET SYSTEM. 1. General. Work under this subhead is time-bound and has t be completed within the time limit set in the tender. Work shall be executed in accordance with an agreed schedule which shall be submitted by the tenderers along with offer and agreed to by owners. Scope of work. The scope of work in this subhead shall consist of furnishing all labour, materials, equipment and appliances necessary and required to completely do all work relating to the supply, installation, testing & commissioning of Fire Fighting System as described herein after and shown on the drawings.

release the trapped air in the pipe work. At each tapping from the Riser a Orifice Plate shall be located in the lower floors to reduce the pressure. An overhead tank 20000 litres capacity will be connected to the fire hydrant system. 1.8.10 Sprinkler system shall be distributed entire building so as to cover 12-12 sq.m area with one sprinkler

  Tapping

Download SPECIFICATIONS FOR FIRE HYDRANT & SPRINKLET SYSTEM. - …


Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Related search queries