Transcription of 2.14 Construction Methodology - Washington
{{id}} {{{paragraph}}}
Construction Methodology . WAC 463-42-255 Proposal Construction Methodology . The applicant shall describe in detail the Construction procedures, including major equipment, proposed for any Construction activity within watercourses, wetlands and other sensitive areas. Introduction In general, the project 's wind turbines, site roads, underground cables, and other supporting infrastructure are located on the higher ridge tops with good wind exposure and not in wetlands or watercourses. Environmental mitigation activities include the installation of erosion, drainage, and storm water systems along disturbed slopes.
Kittitas Valley Wind Power Project EFSEC Application Section 2.14 Construction Methodology January 12, 2003 Page 3 temporary power adjacent to the PSE substation area on the northwest corner of Bettas Road and
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Masterpact MTZ, Electric, Masterpactmtz Masterpact MTZ, Power, Project, WAHAH Electric Supply Co. of Saudi, Fukushima Floating Offshore Wind, Fukushima Floating Offshore Wind FarmFukushima Floating, Multifamily, Commercial, Industrial New, We Energies, Electric profiling beds in health care, Magnetic Loop for Improved Reception and, Magnetic Loop for Improved Reception and Noise Rejection