Transcription of 2.14 Construction Methodology - Washington
{{id}} {{{paragraph}}}
Construction Methodology . WAC 463-42-255 Proposal Construction Methodology . The applicant shall describe in detail the Construction procedures, including major equipment, proposed for any Construction activity within watercourses, wetlands and other sensitive areas. Introduction In general, the Project's wind turbines, site roads, underground cables, and other supporting infrastructure are located on the higher ridge tops with good wind exposure and not in wetlands or watercourses. Environmental mitigation activities include the installation of erosion, drainage, and storm water systems along disturbed slopes. No special water rerouting or dewatering is required for Construction .
Kittitas Valley Wind Power Project EFSEC Application Section 2.14 Construction Methodology January 12, 2003 Page 2 Project facilities to slopes and creek beds.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
Electrical Restoration, CABLES Electrical Restoration, Extra high voltage cables with synthetic, Cables, The Fiber Optic Association, Inc, Regulation IO-6.0 Electrical Safety Regulations, Electric Power Distribution Systems, ELECTRICAL, THE INDIAN ELECTRICITY RULES, 1956, NERC COMPLIANCE FOR UTILITIES