Transcription of 2008T Preventive Maintenance Procedures
{{id}} {{{paragraph}}}
2008T HEMODIALYSIS SYSTEM Preventive Maintenance Procedures Part Number 508033 Rev. O Page ii 2008T Preventive Maintenance Procedures P/N 508033 Rev. O FRESENIUS MEDICAL CARE NORTH AMERICA 800-227-2572 Fresenius Medical Care North America 920 Winter St. Waltham, MA 02451 Manufactured by: Fresenius USA, Inc. 4040 Nelson Avenue Concord, CA 94520 Page iii 2008T Preventive Maintenance Procedures P/N 508033 Rev. O 2008T HEMODIALYSIS SYSTEM Preventive Maintenance Procedures Part Number 508033 Rev. O INCLUDING Preventive Maintenance CHECKLISTS SIX (6) MONTH AND ANNUAL/4000 HOUR Copyright 2008 2020 Fresenius Medical Care. All Rights Reserved. Page iv 2008T Preventive Maintenance Procedures P/N 508033 Rev. O 2008T Preventive Maintenance Procedures This document contains proprietary information of Fresenius USA, Inc. d/b/a Fresenius Medical Care North America and its affiliates ( Fresenius Medical Care ). The contents of this document may not be disclosed to third parties, copied, or duplicated in any form, in whole or in part, without the prior written permission of Fresenius Medical Care.
2008T Preventive Maintenance Procedures P/N 508033 Rev. O. 1.1 SUPPLIES NEEDED A number of small parts must be available to perform the Preventive Maintenance (PM). Kits are available that include the necessary parts needed, except for the 9-Volt battery that must be replaced annually. An NEDA 1604AC heavy-duty (alkaline type) battery is required.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}