Transcription of 2015 Plumbing Rough In Checklist - MyBuildingPermit
{{id}} {{{paragraph}}}
Inspection Checklist Residential Plumbing Rough In July 2016 This Inspection Checklist reflects code requirements of the 2015 International Residential Code (IRC), 2015 Uniform Plumbing Code (UPC), 2014 National Electrical Code (NEC), and the 2015 International Fire Code (IFC). GENERAL INFORMATION: This Checklist is intended for use to prepare for an inspection. This is only a general list and is not intended to address all possible conditions. Additional information can be obtained from your local participating jurisdiction. Page 1 of 6 Please verify the following before calling for a Plumbing Rough -in inspection. Permits and Plans Job address is posted in a visible location. (IRC ) Permit and approved plans are on site and accessible to the inspector. (Amend. Ord.) Permit information is correct. (address, permit number, scope of work, etc). (UPC ) Confirm that all fixtures are included.
Backflow prevention for protection from fire-sprinkler, irrigation systems, or other cross connection/contaminations. (UPC 603 and WA. State Cross-Control Manual) Water service buried deep enough to protect from freezing. Minimum is typically 18” or 12” below frost level, but varies from jurisdiction to jurisdiction. (UPC 609.1)
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}