Transcription of 2016 Road and Bridge TOC Section 200 - vdot.virginia.gov
{{id}} {{{paragraph}}}
VDOT 2016 Road and Bridge Standards Section 200 - Curbs, Medians, and Entrances Standard Page Title NOTES. CG-2 Standard 6" Curb CG-3 Standard 4" Curb CG-6 Combination 6" Curb & Gutter CG-7 Combination 4" Curb & Gutter Asphalt Concrete Curb and Median for Temporary or Permanent MC-3, 3A Installation Asphalt Concrete Curb and Median for Temporary or Permanent Installation MC-3B, 3C. STANDARD REVISED AUGUST 2017, FOR PREVIOUS VERSION. Asphalt Concrete Curb (Asphalt Backup Material Installation). OF STANDARD FOLLOW THIS LINK. STANDARD REVISED AUGUST 2017, FOR PREVIOUS VERSION. MC-4 Asphalt Paving Under Guardrail OF STANDARD FOLLOW THIS LINK. MC-1 Concrete Median Curb MS-1 Standard Solid Concrete Raised Median Strip MS-1A Standard Solid Concrete Raised Median Strip MS-2 Standard Raised Grass Median Strips MS-4 Standard Raised Asphalt Median with Concrete Curb Standard Entrance Gutter for use with Flared Opening (For use CG-9A across sidewalk).
standard revised april 2019, for previous version of standard follow this link new standard april 2019 new standard april 2019 cg-12 cg-12-ins standard revised april 2019, for previous version of standard follow this link notes 2 of 2. title: 2016 road and bridge_toc section 200.xls
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}