Transcription of 2017 SSMP 5. Standard Operating Procedures
{{id}} {{{paragraph}}}
ID No.: SS-SOP-01 Rev. No.: 0 Date: 2/28/2017 Page: 1 of 8 Standard Operating Procedure Document No: SS- SOP-01 City of Hollister Title: PREVENTATIVE MAINTENANCE PROGRAM Revision: 0 Issued by: Danny Hillstock, Associate Engineer, Utilities City of Hollister Prepared by: Bill Callahan, Director of Public Works Administration, Wallace Group Page: 1 of 8 Effective Date: 2/28/2017 1. Health and Safety Warnings 1. All O&M activities must be conducted in a safe and efficient manner that protects City Staff, the City s contractors, and the public. 2. Employees are required to follow the City s or contractor s safety practices and Procedures , whichever is more stringent. These Procedures must establish guidelines in compliance with the: a. Occupational Health and Safety Administration (OSHA); b.
ID No.: SS-SOP-01 Rev. No.: 0 Date: 2/28/2017 Page: 2 of 8 n. Weather conditions 2. Cautions 1. Equipment must be used as directed by City SOPs and manufacturers’ instructions.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}