PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: barber

2019 CALGREEN RESIDENTIAL OCCUPANCIES …

1 2019 CALGREEN RESIDENTIAL OCCUPANCIES APPLICATION checklist SECTION Effective January 1, 2020 HCD SHL 615C (New 01/20) FEATURE OR MEASURE LEVELS APPLICANT TO SELECT ELECTIVE MEASURES VERIFICATIONS ENFORCING AGENCY TO SPECIFY VERIFICATION METHOD Mandatory Prerequisites and Electives1 Enforcing Agency All Installer or Designer All Third-Party All Tier 1 Tier 2 PLANNING AND DESIGN Site Selection A site which complies with at least one of the following characteristics is selected: infill site is selected. greyfield site is selected. EPA-recognized Brownfield site is selected. Facilitate community connectivity by one of the following methods: project within a 1/4-mile true walking distanceof at least 4 basic services; project within 1/2-mile true walking distanceof at least 7 basic services; or methods increasing access to additionalresources.

2019 CALGREEN RESIDENTIAL OCCUPANCIES APPLICATION CHECKLIST SECTION A4.602 Effective January 1, 2020 : HCD SHL 615C (New 01/20) LEVELS APPLICANT TO SELECT ELECTIVE MEASURES VERIFICATIONS ENFORCING AGENCY TO SPECIFY VERIFICATION METHOD : FEATURE OR MEASURE: Mandatory Prerequisites and Electives: …

Tags:

  Applications, Checklist, 2019, Residential, Occupancies, 2019 calgreen residential occupancies, Calgreen, 2019 calgreen residential occupancies application checklist

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of 2019 CALGREEN RESIDENTIAL OCCUPANCIES …