PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bachelor of science

2373-3M MDR System

The assembly of the MDR plugrequires the following tooling whichmust be ordered individually prior toany tooling set-up: 10960-2000 ..Hand Press (Fig. 1) 10961 ..Cutting Unit (Fig. 5); includes 2 spare blades (10970-9) 10962-2000 ..Fixture Unit (Fig. 14); includes 14, 20, 26, 36, 40, 50, 68, 80, and 100 position connector stops 10964-1 ..Cable Clamp (Fig. 13); Black, 14-50 position 10964-2 ..Cable Clamp (Fig. 13); Silver, 68-100 position Optional: 10963-2000 ..Fixture Block (Fig. 12); Not requiredfor initial unit; only needs to be orderedwhen additional stations are also order another 10962-2000. Initial Tooling Set Up 1. Unpack the items listed above and set them on a clean work bench.

The assembly of the MDR plug requires the following tooling which must be ordered individually prior to any tooling set-up: • 10960-2000.....Hand Press (Fig. 1)

Loading..

Tags:

  Plugs

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of 2373-3M MDR System

Related search queries