Transcription of 3. Project Description and Methodology - ABP …
{{id}} {{{paragraph}}}
Environmental Statement for Port of Southampton: Berth 201/202 Works updated by Further Information 23 3. Project Description and Methodology Project Description Berth Reconstruction The proposed works are designed to provide a deep-water berth at the container terminal capable of accommodating a 400m long, draught vessel alongside at all states of the tide. The existing quay construction at Berths 201 and 202 comprises a vertical sheet-pile wall tied to a reinforced concrete relieving platform, which is supported via steel bearing piles. The sheet piles extend to a level of approximately -20m Chart Datum (CD), with the associated bearing Executive Summary: Chapter 3. Project Description and Methodology The proposed works are designed to provide a deep-water berth capable of accommodating a 400m long, draught vessel alongside the existing Berths 201 and 202 of the container terminal.
Environmental Statement for Port of Southampton: Berth 201/202 Works updated by Further Information 23 3. Project Description and Methodology
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}