Transcription of 310 SERIES LAYER 2 MANAGED NETWORK SWITCHES …
{{id}} {{{paragraph}}}
310 SERIES LAYER 2 MANAGED NETWORK SWITCHESQ uick Start GuideAN-310-SW-F/R-8AN-310-SW-F/R-16AN-3 10-SW-F/R-24AN-310-SW-F-48AN-310-SW-F/R- 8-POEAN-310-SW-F/R-16-POEAN-310-SW-F/R-2 4-POE3 Araknis Networks 310 SERIES LAYER 2 MANAGED NETWORK SwitchesQuick Start Guide 2016 Araknis Networks FCC WarningChanges or modifications not expressly approved by the party responsible for compliance could void the user s authority to operate the equipment. This device complies with Part 15 of the FCC Rules. Operation is subject to the following two conditions: This device may not cause harmful interference, and This device must accept any interference received, including interference that may cause undesired : This equipment has been tested and found to comply with the limits for a Class A digital device, pursuant to part 15 of the FCC Rules.
9 SFP 10 SFP Link/Act 1 Gbps RESET 1 3 5 7 2 4 6 8 1 Gbps Link/Act 9 SFP 10 SFP Link/Act 1 Gbps Computer Switch Switch 120V AC Wall Outlet Router ENABLED IP Camera NOTE: AN-310-SW-R-8-POE shown. Connection is the same for models with both front- …
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}