32 11 23 - Aggregate Base Course - Bay Area Rapid Transit
Issued: 10/01/2010 PAGE 2 OF 5 STANDARD SPECIFICATIONS 1.05 REFERENCES A. American Society for Testing and Materials (ASTM): 1. ASTM C136 Test Method for Sieve Analysis of Fine and Coarse Aggregates 2. ASTM D421 Practice for Dry Preparation of Soil Samples for Particle-Size Analysis and Determination of Soil Constants 3.
Tags:
Analysis, Tests, Standards, Methods, Sieve, Test method for sieve analysis
Information
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
Documents from same domain
01 32 16 - Construction Progress Schedule
webapps.bart.govrelease – r3.0 section 01 32 16 bart facilities standards issued: january 2013 page 1 of 6 standard specifications section 01 32 16 construction progress schedule
Schedule, Construction, Progress, 32 16 construction progress schedule
07 51 00 - BUILT-UP BITUMINOUS ROOFING
webapps.bart.govbuilt-up bituminous roofing release - r1.2 section 07 51 00 bart facilities standards save date: 8/5/2004 2:14 pm page 3 of 8 standard specifications
Roofing, Built, Bituminous, 00 built up bituminous roofing, Built up bituminous roofing
08 71 00 - Door Hardware
webapps.bart.govDOOR HARDWARE RELEASE - R3.0 SECTION 08 71 00 BART FACILITIES STANDARDS Issued: January 2013 PAGE 3 OF 9 STANDARD SPECIFICATIONS F. Samples: If requested by the Engineer, submit one sample of each type of hardware.
Hardware, Specification, Doors, Door hardware, 08 71 00 door hardware
01 32 16 - Construction Progress Schedule
webapps.bart.govconstruction progress schedule release – r2.1.1 section 01 32 16 bart facilities standards issued: 10/01/2010 page 2 of 5 st andard specifications
20 20 13 - Pipe Sleeves, Supports, and Anchors for ...
webapps.bart.govPIPE SLEEVES, SUPPORTS, AND ANCHORS FOR FACILITY SERVICES PART 1 - GENERAL 1.01 SECTION INCLUDES ... PIPE SLEEVES, SUPPORTS, AND ANCHORS FOR FACILITY SERVICES RELEASE - R2.1 SECTION 20 20 13 BART FACILITIES STANDARDS ... Pipe hangers and supports shall have non-metallic felt or elastomeric liner or wrap applied
Support, Pipe, Anchor, Sleeve, Hanger, Pipe hangers and supports, Pipe sleeves, And anchors for
28 31 00 - Fire Detection and Alarm System
webapps.bart.govA. General: Fire detection and alarm systems, as specified herein, will not be measured separately for payment but will be paid for as part of the contract lump sum price for Electrical Work as indicated in the Bid Schedule of the Bid Form.
System, Fire, Lamar, Detection, Fire detection and alarm, 00 fire detection and alarm system
PART 1 – GENERAL 1.01 SECTION INCLUDES
webapps.bart.govSECTION 14 21 00 . ELECTRIC TRACTION ELEVATORS. PART 1 – GENERAL . 1.01. SECTION INCLUDES . A. Hoistway Construction B. Machine Room . C. Equipment in Hoistway and Machine Room D. Hoistway Entrances . E. Car and Hoistway Doors F. Electronic Door Edge Sensor
General, Section, Part, Part 1 general, Include, Part 1 general 1, 01 section includes
20 20 13 - Pipe Sleeves, Supports, and Anchors for ...
webapps.bart.govC. Criteria for Pipe Supports, Hangers, Guides, and Anchors: 1. Provide hot dipped galvanized steel clevis type pipe hangers and supports suitable for the usage in accordance with these specifications. 2. Provide pipe hangers and supports suitable for the indicated usage in accordance with FS ... PIPE SLEEVES, SUPPORTS, AND ANCHORS FOR FACILITY ...
Support, Pipe, Anchor, Sleeve, Hanger, Pipe supports, Pipe hangers and supports, Pipe sleeves, And anchors for
07 90 00 - Joint Protection
webapps.bart.govA. Joint fillers and sealants for concrete slabs and paving are specified in Section 03 15 00 - Concrete Accessories. B. Control joints in unit masonry are specified in
Protection, Joint, Sealant, Fillers, Joint filler, 07 90 00 joint protection
07 95 00 - Expansion Control
webapps.bart.govSECTION 07 95 00 EXPANSION CONTROL PART 1 - GENERAL 1.01 SECTION INCLUDES A. Expansion joint assemblies. B. Fire-rated joint cover assemblies. 1.02 RELATED SECTIONS A. Expansion and isolation joint fillers and sealants for concrete slabs and paving are specified in Section 03 15 00 - Concrete Accessories.
Control, Joint, Expansion, Sealant, Fillers, Joint filler, 07 95 00 expansion control
Related documents
IS 2720-8 (1983): Methods of test for soils, Part 8 ...
law.resource.orgexpressing the resuit of a test or analysis, shall be rounded off in accordance ... SCOPE 1.1 This standard ( Part 8) lays down the method for the determination of the relation between the water content and the dry density of soils ... 5.1.1 A 5-kg sample of air dried soil passing the 1%mm IS test sieve shall be taken (see Note 1 ). ...
第十七改正日本薬局方における国際調和 - Pmda
www.pmda.go.jpThermal Analysis 2.52熱分析法 ... Table 1 Size of standard sieve series in range of interest 表1 関係する範囲における標準ふるいの ... Bacterial Endotoxins Test 4.01エンドトキシン試験法 (Introduction) (前書き) Apparatus 1. 器具
Determination of Thermal Conductivity of Coarse and Fine ...
www.geothermal-energy.orgIn the standard test ... and 4 showing sieve analysis result of two kinds of sand that used in this research. ... 10 1 0.1 0.01 Grain size, D (mm) Percent finer (%) Figure 3: Plot of percent finer vs. grain size (coarse sand). 0 10 20 30 40 50 60 70 80 90 100 10 1 …
Analysis, Tests, Standards, Sieve analysis, Sieve, Standard test
VOLATILE ORGANIC COMPOUNDS (SCREENING) 2549
www.cdc.govidentification and verified with standard spikes if necessary. EVALUATION OF METHOD: The method has been used for a number of field screening evaluations to detect volatile organic compounds. Estimate of the limit of detection for the method is based on the analysis of spiked samples for a number of different types of organic compounds.
CONSTRUCTION SPECIFICATION FOR HOT MIX ASPHALT
www.walkerind.com310.01 SCOPE 310.02 REFERENCES 310.03 DEFINITIONS 310.04 DESIGN AND SUBMISSION REQUIREMENTS - Not Used ... D 6752-03e1 Standard Test Method for Bulk Specific Gravity and Density of Compacted Bituminous ... Designated Large …
SIEVE ANALYSIS OF FINE AND COARSE AGGREGATE …
wwwsp.dotd.la.govThe sieve analysis of aggregates recovered from asphaltic mixtures is determined in accordance with DOTD TR 309; only the steps for dry sieving in this procedure are used in conjunction with TR 309. TABLE OF METHODS Method A – Dry sieve only. Method B – Wash and dry sieve. Method C – Split sample. Dry sieve, then wash representative ...