PDF4PRO ⚡AMP

Modern search engine that looking for books and documents around the web

Example: bachelor of science

4-12-2021 Revision of the CNP Service Standards Book

0 1 9-7-2018 Revision of the CNP Service Standards Book (Effective Date 10-8-2018) 1. FOREWORD Add Turn Down/Unexecutable Codes (Page 4). For Service connection issues, please refer to the Turn Down/Unexecutable Codes located on the CenterPoint Energy website. 2. Articles Customer Wiring - (Page 16). Revised paragraph. For the Company to supply electrical Service , two or more separately metered services shall not be electrically connected to a common device on the load side of the Service disconnects.

Apr 12, 2021 · 2 15. Article 419.4 – Meter Mounting Clearances – (Page 56) Revised Paragraph : “the meter shall maintain a minimum 36” horizonal distance from a gas meter regulating vent and shall not be located above or below the vent.”

Tags:

  Services

Information

Domain:

Source:

Link to this page:

Please notify us if you found a problem with this document:

Spam in document Broken preview Other abuse

Transcription of 4-12-2021 Revision of the CNP Service Standards Book

Related search queries