Transcription of 4: Drainage (Below Ground Stormwater)
{{id}} {{{paragraph}}}
Technical Solution Sheet 4: Drainage ( below Ground stormwater ). Duplicate solution of Roof Plumbing (Roof and stormwater ). Roof and stormwater AIM SURFACE Drainage SYSTEMS DESIGN. The aim of this technical solution is to clarify the AS/NZS requirements for sizing stormwater drains and Summary of methods to design surface eaves gutters. Drainage systems PLUMBING REGULATIONS 2008 Two methods of design are used depending on The Plumbing Code of Australia (PCA) is adopted the area of the proposed allotment: by and forms part of the Plumbing Regulations 2008. Part D1 of the PCA specifies the objectives 1. Nominal method for single dwellings (rural). and performance requirements related to the and single dwellings (urban) where the installation of roof Drainage systems. AS/NZS allotment size is less than 1000m . This method Plumbing and Drainage - Part 3: does not involve any calculations and some stormwater Drainage & Section 2 of AS/NZS rules are provided regarding diameter of pipes, Plumbing and Drainage - Part 5: depth of cover, gradient and layout.
4: Drainage (Below Ground Stormwater) Duplicate solution of 0.04 Roof Plumbing (Roof and Stormwater) Updated December 2015 www.vba.vic.gov.au Page 1 of 6 Roof and Stormwater AIM The aim of this technical solution is to clarify the requirements for sizing stormwater drains and eaves gutters. PLUMBING REGULATIONS 2008
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}