Transcription of 4: Drainage (Below Ground Stormwater)
{{id}} {{{paragraph}}}
Technical Solution Sheet 4: Drainage ( below Ground stormwater ). Duplicate solution of Roof Plumbing (Roof and stormwater ). Roof and stormwater AIM SURFACE Drainage SYSTEMS DESIGN. The aim of this technical solution is to clarify the AS/NZS requirements for sizing stormwater drains and Summary of methods to design surface eaves gutters. Drainage systems PLUMBING REGULATIONS 2008 Two methods of design are used depending on The Plumbing Code of Australia (PCA) is adopted the area of the proposed allotment: by and forms part of the Plumbing Regulations 2008. Part D1 of the PCA specifies the objectives 1. Nominal method for single dwellings (rural). and performance requirements related to the and single dwellings (urban) where the installation of roof Drainage systems. AS/NZS allotment size is less than 1000m.
Housing installations are “Deemed to Satisfy” documents listed in Part B3 of the PCA and both contain sections on “Surface and Roof Drainage Systems - design”. The Plumbing Regulations 2008 also specify that roofing (stormwater) work must comply with SAA/SNZ HB114 Guidelines for the design of eaves and box gutters.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}