Transcription of 4 Project Description - INPEX
{{id}} {{{paragraph}}}
4 Project DescriptionPage 158 Ichthys Gas Field Development Project | Draft Environmental Impact Statement4 Project Description4 Project IntroductionThis chapter of the draft environmental impact statement (Draft EIS) for the Ichthys Gas Field Development Project (the Project ) describes the major infrastructure components and supporting facilities required to take the Ichthys Field to commercial production. These include the installation of subsea and processing facilities offshore, the installation of a subsea gas export pipeline, and the construction of an onshore gas processing plant and export facilities. The construction and installation of these components are described sequentially from the Ichthys Field through to Darwin Harbour, and from the Harbour to the onshore processing plant at Blaydin , social, economic and safety criteria have been considered in the selection of technically viable design alternatives.
Ichthys Gas Field Development Project | Draft Environmental Impact Statement Page 159 4 Project Description • a shipping channel, approach area, turning basin
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}