25It is essential to identify location of openings, mechanical and electrical (M&E) services, and other fixtures before INSTALLATION of drywall. The setting out of the framing system, openings and additional supports are critical contributors toward the functionality of the drywall. Sequence of board INSTALLATION , proper infill and insulation material INSTALLATION , and treatment material compatibility are also important to achieving quality work. All site work should be carried out in a safe manner to comply with safety Framing WorksFraming works form the structural component of the drywall.
approved method statement, material and sample. 2. Placing of infill and insulation material • All infill and insulation material for installation as per approved method statement and material. • Ensure all spaces are filled with insulation material. • Ensure that all recessed panels, electrical outlets, light switch boxes, etc
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}