25It is essential to identify location of openings, mechanical and electrical (M&E) services, and other fixtures before INSTALLATION of drywall. The setting out of the framing system, openings and additional supports are critical contributors toward the functionality of the drywall. Sequence of board INSTALLATION , proper infill and insulation material INSTALLATION , and treatment material compatibility are also important to achieving quality work. All site work should be carried out in a safe manner to comply with safety Framing WorksFraming works form the structural component of the drywall. It is also critical towards fulfilling its functionality as a wall. Figure highlights the sequence of the framing INSTALLATION process and the recommended good practices to achieve quality Drywall Frame INSTALLATION SequenceWork SequenceGood Practices1.
INSTALLATION 27 Work Sequence Good Practices 5. Install intermediate studs • Studs to be installed at interval as per approved shop drawings. • Intermediate studs must face same direction to allow for adjustment when fixing plasterboard.
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}