155 AASHTO/AWS ScopeSection 7 contains general requirements for weldingsteel studs to steel (see and for approvedsteels). In addition, it stipulates specific requirements forthe following:(1) Workmanship, preproduction testing, operatorqualification, and application qualification testing, whenrequired, all to be performed by the Contractor(2) QC and QA inspection of stud Welding duringproduction(3) Mechanical properties of steel studs, and require-ments for qualification of stud bases, all tests and docu-mentation to be furnished by the stud General shall be of suitable design for arc Welding tosteel members with the use of automatically timed studwelding equipment.
155 AASHTO/AWS D1.5M/D1.5:2002 7.1 Scope Section 7 contains general requirements for welding steel studs to steel (see 7.2.7 and 1.2.2 for approved