8. TESTING POWER TRANSFORMERS High-voltage TRANSFORMERS are some of the most important (and expensive) pieces of equipment required for operating a POWER system. The purchase, preparation, assembly, operation and maintenance of TRANSFORMERS represent a large expense to the POWER system. OVERVIEW When TRANSFORMERS are received from the factory or reallocated from another location it is necessary to verify that each transformer is dry, no damage has occurred during shipping, internal connections have not been loosened, the transformer s ratio, polarity, and impedance agree with its nameplate, its major insulation structure is intact, wiring insulation has not been bridged, and the transformer is ready for service. Physical size, voltage class, and kVA rating are the major factors that dictate the amount of preparation required to put TRANSFORMERS in service.
screw, nut, and bolt terminals for tightness, including the wires on CTs where they originate at the connection boxes on the high-voltage bushings. If there is an UL tap changer, its wiring must also be checked. Wire checking a transformer’s auxiliary equipment is useful for several reasons. A
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}