Transcription of A. Introduction 1. Title - nerc.com
{{id}} {{{paragraph}}}
Standard PRC-019-2 Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection Page 1 of 11 A. Introduction 1. Title : Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection 2. Number: PRC-019-2 3. Purpose: To verify coordination of generating unit Facility or synchronous condenser voltage regulating controls, limit functions, equipment capabilities and Protection System settings. 4. Applicability: Functional Entities Generator Owner Transmission Owner that owns synchronous condenser(s) Facilities For the purpose of this standard, the term, applicable Facility shall mean any one of the following: Individual generating unit greater than 20 MVA (gross nameplate rating) directly connected to the Bulk Electric System.
Standard PRC-019-2 — Coordination of Generating Unit or Plant Capabilities, Voltage Regulating Controls, and Protection Page 1 of 11 A. Introduction 1. Title: Coordination of Generating Unit or Plant Capabilities, Voltage Regulating
Domain:
Source:
Link to this page:
Please notify us if you found a problem with this document:
{{id}} {{{paragraph}}}
2014 BOARD OF SUPERVISORS, 2014 BOARD OF SUPERVISORS MINUTES: 1151, Board, Poughkeepsies’ Joint Water Board, 2013, Belize Electricity Limited, 2014, Budget and Grid Management Charge Rates, Transmission, The Monitoring and Evaluation/, Plan, The Monitoring and Evaluation/ Accountability Framework, The Monitoring and Evaluation/Accountability Framework